Requirements For Operation
warning |
|
---|---|
|
Read carefully before continuing. |
In order to operate flawlessly, Augmenta’s field analyzer must be the tallest entity on the cab so nothing can cast shadows on it's light sensor.
ISOBUS
In order to operate the Augmenta system with ISOBUS equipment some configuration needs to be done on the VT A Universal Terminal (formerly Virtual Terminal) is an electronic display or console capable of interfacing with ECUs on an ISOBUS network. side.
The machinery should be able to perform a VRA Variable Rate Application utilizes a prescription (Rx) map for a given field and product to automatically adjust the rate of application based upon the target rate zones within the field.
The .shp, .shx, and .dbf files required to create a shapefile prescription map must be in a polygon shape format that complies with the ESRI (Environmental Systems Research
Institute) shapefile specifications and must also be in the WGS (World Geodetic System) 84 datum. operation using ISOBUS licenses (must be VRA-Ready).
Augmenta has the following requirements in order to operate using ISOBUS:
- ISOBUS Task-Controller (ISOBUS-TC) must be present and activated (TC-BAS, TC-GEO).
- An ISOBUS Task must be active.
- Operation requirements (Master switch, minimum speed, etc) must be fulfilled.
AIM COMMAND
In order to operate the Augmenta system with AIM COMMAND equipment some configuration needs to be done on the VT side.
The machinery should be able to perform a VRA operation using AIM COMMAND licenses.
Augmenta has the following requirements in order to operate using AIM COMMAND:
-
Operation requirements (Master switch, minimum speed, etc) must be fulfilled.