Operate the Bin Chain Job Widget

Note:  If no bin chains have been configured, the following options will not be available. Refer to Configure a Bin Chain in ROS and Configure Chain Profiles for instructions on configuring bin chains and chain profiles.

To reset the chain to the first link, press the left half of the Bin Chain button.

To activate or deactivate cleanout, press the right half of the Bin Chain button. Cleanout is only available after the chain has completed with the advance method detected for all links in the chain.

To open the settings page, long press the bin chain button. There are two tabs. The first tab (Bin Chain Settings) allows the user to adjust the settings as desired. The second tab (Bin Link Order) allows the user to rearrange bin chain order.

Bin Chain Settings Tab

To view and adjust settings on the Bin Chain Settings tab:

  1. Select and hold the Bin Chain widget. The Bin Chain Settings will open.

Bin Link Order Tab

To reorder products on the Bin Link Order tab:

  1. Use the up or down arrow next to the desired link to move it up or down the list.

  2. Once complete, select the Done button to save the settings. If desired, select Reverse to reset the order to the previously ran job.

Bin Chain Errors

There are a few possible errors that only occur when using bin chain recall:

Last Revised: Jul 2024