Operation
Starting Jobs
The ISO UT must be calibrated specifically for the machine and implement before being used to operate the steering system (RS1™, SC1™). Refer to the UT display or Raven field computer operation manual for assistance with setting up and starting a job, setting guidance lines, and other guidance settings during in-field operations.
Make sure to properly configure the guidance width of the UT and/or Raven field computer for any changes to the physical width of the implement before starting a job. Review the Raven field computer operation at https://ravenindustries.mcoutput.com/fieldcomp/Default.htm.
Last Revised: Oct 2024