Base Station 2.0 Installation

Contact your regional Raven Sales or Precision Agriculture Specialist to coordinate installation and set up of the Slingshot® base station 2.0.

Note:  Be sure that all required items outlined in the Base Station Antenna Installation have been completed prior to installing the base station.

  1. Setup the Slingshot base station 2.0 unit in the prepared location.

    Note:  The base station tray is compatible with a 1U 48 cm [19 in.] server rack for optional mounting.

  2. Connect the base station antenna cable to the TNC connector on the base station.
  3. Connect the supplied Ethernet cable from the internet source to the Ethernet port on the base station.
  4. Connect the square, four-pin connector on the power adapter cable to the power plug on the base station.
  5. Route the power adapter cable to one of the battery backup plugs on the UPS or power source.

Last Revised: Sep 2024