Base Station 2.0 Installation
Contact your regional Raven Sales or Precision Agriculture Specialist to coordinate installation and set up of the Slingshot® base station 2.0.
Note: Be sure that all required items outlined in the Base Station Antenna Installation have been completed prior to installing the base station.
- Setup the Slingshot base station 2.0 unit in the prepared location.
Note: The base station tray is compatible with a 1U 48 cm [19 in.] server rack for optional mounting.
- Connect the base station antenna cable to the TNC connector on the base station.
- Connect the supplied Ethernet cable from the internet source to the Ethernet port on the base station.
- Connect the square, four-pin connector on the power adapter cable to the power plug on the base station.
- Route the power adapter cable to one of the battery backup plugs on the UPS or power source.
Last Revised: Sep 2024